 Turbine Overview Screen


·     Tornado twin shaft developed in 1981
·     Power rating 8000bhp (5.7MWe ISO)
·     Nominal speed 9600rpm PT
·     Efficiency 32% Thermal
·     DLE version introduced 1996
·     Uprated version introduced 1999 (10000bhp, 7MWe ISO)
 
  Turbine Overview Screen
 Lube Oil Supply


·     Lub oil system supplies both turbine and compressor bearings
·     Lub oil system is very important - sleeve bearings at high temperatures
·     Three sub systems:-
·     Emergency
·     AC Pre & Post
Mechanical 



·     System is water cooled via a thermostatic valve
LUB OIL SYSTEM

SYSTEM SETTINGS

·     Pressure relief valves set to 100psi for both AC and Mechanical pumps

·     Main system PCV sets rail pressure to nominally 207kpa (30psi)

·     Emergency system PCV sets rail pressure to nominally 207kpa (30psi)

·     System thermostatic valve sets temperature to nominally 44°C

·     TE-8216 & TE-8217 operate tank heaters at 32°C

SYSTEM SETPOINTS
·     Cold oil start permissive set to 21°C via TE-8220

·     Filter differential pressure set to 137kpa (20psi) via PDSH-8212

·     High temperature alarm set to 60 °C  via TE-8219

·     High temperature trip set to 68 °C via TSHH-8218

·     Low level alarm set to 28cm (11inch) via LSL-8213

·     Low level alarm set to 35cm (14inch) via LSL-8213
 

 Turbine Lube Oil Distribution 


·     All turbine bearings are white metal sleeve or shell  construction
·     Need for continuous lubrication for rotation and cooling
·     Two distinct rails; hot and cold
·     Two types of bearing used; radial and thrust
 


·     All bearings have dedicated temperature and vibration monitoring
Rail pressures are monitored for low pressure problems 


PRESSURE SETTINGS AND SETPOINTS

·     Hot rail set to nominally 207kpa (30psi) via PCV-8218

·     Cold rail set to nominally 207kpa (30psi) via PCV-8218



·     Low pressure alarm set to 172kpa (25psi) via PT-8218

Low pressure trip set to 138kpa (20psi) via PT-8218 or PSLL-8219
 Turbine Inlet -Exhaust Overview



·     Primary core engine protection and control
·     All monitoring is carried out by type K thermocouples
·     Two thermocouples monitor compressor inlet
·     Two thermocouples monitor compressor exit
·     Sixteen thermocouples monitor turbine interduct
·     All combustors are independently monitored by two thermocouples
 
 Turbine Fuel System


GAS FUEL SYSTEM

GAS FUEL SETPOINTS

PLC FUNCTIONS
·     High supply pressure via PT-8271
·     Alarm set to 2067kpa (300psi)
·     Trip set to 2172kpa (315psi)
·     Low supply pressure via PT-8271
·     Alarm set to 1585kpa (230psi)
·     Trip set to 1481kpa (215psi)

FDAE FUNCTIONS
·     Supply pressure via PT-8273 or PT-8277
·     High trip set to 2172kpa (315psi)
·     Low trip set to 620kpa (90psi)
·     Burner pressure via PT-8275 or PT-8276
·     High trip set to 1723kpa (250psi)
·     Supply temperature via TE-8295
·     High trip set to 110 °C
·     Low trip set to 0 °C
 
 Ventilation and Combustion Air System
Turbine  Hydraulic System 



·     Two systems, starter system and vgv system
·     Both fed from main luboil system
·     Starter system operating up to 35000kpa
·     VGV system operating up to 4800kpa
·     Starter system driven by AC motor, VGV system driven by mechanical means

HYDRAULIC SYSTEM

SYSTEM PRESSURES & SETTINGS

·     Starter system working pressure, 2757kpa to 35000kpa

·     VGV system working pressure, nominally  4800kpa

·     Starter system oil supply filter differential trip set to 165mm Hg via PDSHH8201

·     Starter system low pre-charge pressure trip set to  1724kpa via PSLL8203

·     VGV has no pressure monitoring but relies on actual position of VGV ram

 
 Water Wash System




·     Used for the cleaning of the gas generator compressor blading
·     Offline and online washes available
·     Uses hazardous solvents such as Zok 27
·     Requires clean water supply - de-mineralized
·     Uses separate was trolley for fluid injection
·     Also requires external instrument or shop air supply


WATER WASH SYSTEM

SYSTEM PRESSURES
·     Air supply to trolley, 550kpa to 827kpa
·     Air supply to skid edge >550kpa
·     Air supply to labyrinth seals >27kpa


SYSTEM SETTINGS
·     Low air supply pressure, set to 517kpa (permissive & alarm)

·     Low labyrinth seal air supply, set to 15kpa (permissive alarm)

·     Low turbine inlet air temperature, set 10°C (add antifreeze to fluids)

·     Low turbine inlet air temperature, set  -10°C (abort wash)

 
 Start Permissives




·     Pre-start conditions additional to trip functions
·     All permissives must be met in order to start turbine
·     If not all met produces a ‘not ready’ indication on main screen (S1 F2
 
 Turbine Vibration


TURBINE VIBRATION

TURBINE VIBRATION SETPOINTS

General vibration equipment fault is given when any probe falls below 4 volts gap and the green OK light goes out on the Bently module

Gas Generator Inlet, VE-8274 & VE-8291
Alarm set to 65µm pk/pk
Trip set to 90µm pk/pk
Gas Generator Exit, VE-8275 & VE-8290
Alarm set to 65µm pk/pk
Trip set to 90µm pk/pk
Gas Generator Trust, VE-8271
Alarm set to 0.3mm Normal, 0.65mm Counter
Trip set to 0.4mm Normal, 0.8mm Counter
Power Turbine Inlet, VE-8278 & VE-8288
Alarm set to 65µm pk/pk
Trip set to 90µm pk/pk
Power Turbine Exit, VE-8281 & VE-8286
Alarm set to 65µm pk/pk
Trip set to 90µm pk/pk
Power Turbine Thrust, VE-8299
Alarm set to 0.3mm Normal, 0.65mm Counter
Trip set to 0.4mm Normal, 0.8mm Counter
Fire Protection System 




·     All functions carried our by independent F&G chassis
·     F&G has own dedicated power supply
·     Utilizes IR detectors for fire detection
·     Utilizes Heat detectors for fire detection
·     Utilizes Gas detectors for high gas level detection
·     Utilizes CO2 for extinguishant
 